Inspection checks condition; testing checks performance; maintenance preserves or restores operability. The matrix below is an educational starting point, not a legally approved maintenance calendar. The adopted NFPA edition, AHJ, occupancy, manufacturer instructions and equipment configuration control final tasks and frequencies.

SystemReferenceTaskIllustrative intervalQualification
Portable extinguishersNFPA 10Visual inspectionMonthlyConfirm accessibility, seal, gauge/condition and location; site circumstances may require more frequent checks.
Portable extinguishersNFPA 10Qualified maintenanceAnnuallyAdditional internal examination and hydrostatic tests vary by extinguisher type.
SprinklersNFPA 25Sprinkler and exposed pipe visual inspectionAnnuallyCheck condition, obstruction, corrosion, leakage and alterations.
SprinklersNFPA 25Fire department connection inspectionQuarterlyCheck caps, accessibility, signage and visible damage.
SprinklersNFPA 25Control valve inspectionWeekly / monthly / quarterlyDepends on locking, supervision and applicable edition.
SprinklersNFPA 25Main drain testAnnually or as triggeredSome systems and supply configurations need more frequent testing.
SprinklersNFPA 25Internal piping condition assessmentCondition and edition dependentObstruction investigation and other assessment triggers are not interchangeable.
Fire pumpsNFPA 25Pump room, pump and driver inspectionWeeklyCheck readiness and recorded operating conditions.
Fire pumpsNFPA 25Diesel fire pump no-flow testWeeklyFollow the adopted standard and manufacturer procedures.
Fire pumpsNFPA 25Electric fire pump no-flow testWeekly or monthlyPump configuration and adopted edition govern.
Fire pumpsNFPA 25Pump performance flow testAnnuallyRecord churn, rated and peak demand points where applicable.
Fire alarmsNFPA 72Detector, notification, panel and interface inspections/testsDevice-specificApply the adopted edition inspection and test tables, not one universal annual rule.
Fire doorsNFPA 80Fire door assembly inspection and testingAnnually (typical)Record gaps, hardware, closing/latching and alterations; competent inspection required.
Clean agentNFPA 2001System and container inspection / testingEquipment-specificAgent, cylinders, enclosure and manufacturer requirements differ.

Asset-level compliance record

  1. Record asset identifier, location, occupancy, manufacturer, serial number, installed configuration and responsible owner.
  2. Identify governing authority, adopted edition, referenced clause and applicable task frequency.
  3. Assign competent inspectors/testers and keep dated readings, observations, photographs and test reports.
  4. Log deficiencies by criticality, notify stakeholders of impairments, and record compensatory measures.
  5. Document repairs, retests, restoration and independent closure evidence.

Reference sources

NFPA: deficiencies and impairments · AFSA: sample ITM data tables · NFPA: authorized standards

Editorial review: October 2026. Frequencies are indicative and not guaranteed to match every edition or system. Obtain an authorized copy of the locally adopted edition for compliance decisions.

Codes library · Pakistan compliance · Request an asset-specific ITM programme